|
REQUEST
FOR NEW LEASE SITE AND APPROVAL OF BUILDING PLANS
The
first step in this process is to schedule a preliminary site visit
with Domain Manager (x1268) to discuss house plan ideas and the
lot you have selected. If a lot and plan are incompatible, it may
be recommended that one or the other be changed.
Information Required
Applicant's
Name:
Address:
Phone Number:
Location
of Proposed Lease:
Proposed
Builder:
Square
Footage: (Interior) ______________ (Other) __________________ House plans
attached: ________
The following details
are included:
A) One-quarter inch
floor plan with rooms labeled & dimensions shown
B) One-eighth or one-quarter
inch scale elevations of all exterior surfaces
C) Site plan which shows:
_____ placement
of house on lot in compliance with set back requirements
_____ location
of proposed driveway, fences, outbuildings, sidewalks
_____ location
of trees to be cut
(you must schedule a walk
through with Domain Manager, ext. 1268
prior
to asking for Lease Committee approval). See attached procedures.
D) Exterior finish (include
sample of each)
Type of Siding: ___________________
Color of Trim: ______________________
Color of Siding: ___________________
Color & Type of Roofing: ___________
E) Description of patio/porch/deck
surfaces, railing design, colors, etc.,
F) Foundation material:
Estimated date to start
construction:
Estimated date to finish
construction: |